If a hotel project requires state review, the work is carried out in two stages:
1. Hotel design – stage "P";
2. Development of hotel working documentation – stage "RD."
In addition, plans for connecting utility lines and fire alarms are developed. For seismically active areas, special attention is paid to the stability and reliability of structures. During the first stage, drawings of all buildings, including technical annexes and rooms, are developed.
Mandatory attention is paid to organizing traffic flow, placing recreation areas, and landscaping. A bill of materials indicating volumes is prepared for each hotel building.
Fantalis, a design and construction company, specializes in developing hotel projects, from 2-star to 5-star hotels with a range of additional services. We have experience solving all possible problems associated with hotel design and the placement of entertainment venues. Each of the company's specialists is responsible for a specific stage of the work, but together they form a well-coordinated team capable of preparing a project of any complexity and purpose. After all, each type of architectural solution has its own specifics. You can't possibly know it all. That's why we've carved out our niche: creating original and bespoke solutions for the hotel industry.